Phase I ESA software, from site visit to signed report.
Envee keeps the assessment in one project record. The field checklist, photos, figures, and report sections live in the same place, so nothing is retyped between the site and the final.
- Active
- Checklists
- Reports
- Completed
- Site walk checklist24 of 24 itemsGenerated
- Photo log38 photos, captioned by categoryGenerated
- Figures 1 and 2Topographic map and aerial site planAttached
- Phase I reportYour template, Word and PDF86% drafted
Every part of the assessment, in one project.
Each tool works from the same project, so the report draws on what was captured on site instead of on someone’s notes. Facts are entered once and linked everywhere the report uses them.
Projects board
Every Phase I on one board, from site visit to final. Checklist, photo log, and report status show on every card, with deadlines on a shared calendar.
Field checklists
Your firm’s checklist on a phone or tablet, with photos captioned as they are taken. Work is saved on the device when the signal drops, then synced.
Figures
USGS topographic and aerial site figures. Outline the property once, label the adjoining properties, place observations, and export to Word or PDF.
City directories
CD Analyzer turns a directory report into occupant tables for the subject property and each adjoining direction, ready for the historical review.
Report writer
Subsections open with your firm’s approved language and the project’s facts. Export to Word and PDF in your own template, then lock the final.
Language library
Approved starter paragraphs and alternatives for each subsection, so every report reads like your firm wrote it.
How a Phase I moves through Envee.
The stages your team already works in, with each one handing its work straight to the next.
-
01
Capture
Work through your checklist on site with photos captioned as you go. Notes, photos, and records are entered once.
-
02
Organize
Checklist answers become project facts, linked to every place the report uses them, and supporting documents are filed by category.
-
03
Draft
Report subsections open in your own template with the project’s facts and your firm’s approved language.
-
04
Deliver
Your environmental professional reviews each section. Export to Word or PDF, and the approved final locks.
Phase I questions.
Short answers on templates, fieldwork, and pricing. There is more in the main FAQ.
Yes. Your report template and standard language come across at setup, so the first report out of Envee already looks like yours. Exports come out as Word and PDF.
Yes. Checklist answers and photos are saved on the device and sync when it is back online.
Envee is built around the Phase I workflow first. Field checklists, figures, and city directory tables are just as useful on Phase II and other site work.
Records request tracking is coming soon. See what it will do.
Per firm, not per seat, banded by headcount, so a team of four is not charged like a team of twenty. The plans are on the pricing section.
See Envee on a Phase I like yours.
A 60 minute walkthrough on one of your own recent reports. Bring your template, and we will show you what Envee replaces, and what it does not.